Loyalist Township

Current Weather
Change Font Size A A
Emergency Services LoyalistFire.ca

Amherst Island Ferry Dock Construction Project

The Ministry of Transportation is constructing new ferry docks at Stella (Amherst Island) and Millhaven.Sheet pile is installed at Stella Dock for the reconstruction of the ferry docks.

The project began in October 2017 with Stage I, the construction of the temporary docks.

Stage II has seen the ferry operations move to the temporary docks. Concurrent with this move, the Frontenac II permanently converted to end-loading operations, meaning vehicles load on and off facing forward. The use of the temporary docks has also brought changes to the marshalling and parking areas on the docks.

For the duration of this project, the most current information will be posted on the project's website, maintained by MTO's general contractor, Rankin Construction. Construction activities will also be updated on the project's Twitter account.