Potter, Creighton, South, Main Infrastructure Upgrades
Loyalist Township and the County of Lennox & Addington are preparing for infrastructure upgrades for the original sections of Potter Drive and Creighton Drive, and the western portion of South Street, as well as Main Street - Odessa between Creighton Drive and West Street. Construction is planned to start in mid-spring 2024. The planned work includes:
- Replacement/repair of watermains and sanitary sewers, right-of-way drainage improvements
- Upgrading Potter Drive to a collector road, including the addition of sidewalks from Main Street - Odessa to the new development areas
- Installing a multi-use pathway along the south side of Main Street - Odessa from Creighton Drive to West Street
- Installing a signalized pedestrian crosswalk of Main Street - Odessa at West Street
Public Information Centre: The Township and the County co-hosted a hybrid Public Information Centre on Wednesday, April 17, 2024. Staff from the Township and the County were on hand to share design information and answer questions. If you weren't able to attend in person or online, you can watch the recording of the meeting. If you have any questions or comments after watching the video, please email the Project Supervisor.
The construction drawings included in the tender are available for your review. (29MB PDF)
Sign up for email updates |
If you live in the project area highlighted in the diagram below or in the Millcreek or Babcock Mills subdivisions and you'd like to receive project update emails about the construction project, please join our mailing list. We will also communicate important updates with those in the project area by means of hand-delivered notices. |
Imagining My Sustainable Community |
In the spring of 2023, Odessa Public School students in Grades 6 and 7 participating in the Imagining My Sustainable Community program shared their vision for sustainable community and civic engagement with Township staff and Council. Council chose to implement three of the ideas presented by the students, with two being incorporated into this project: a rainbow crosswalk, to be located on Main Street - Odessa at West Street; and a purple multi-use pathway along the south side of Main Street - Odessa between Creighton and West. |
For further information, please contact Joe Gratton, Project Supervisor, by email or at 613-386-7351, ext. 172#.
Contact Us